Find a Rep

Contact Us

Case Study

Thermostatic Intelligence

Thermostatic Balancing Simplifies Hot Water Delivery in New Psychiatric Facility

September 1, 2026

When Joe Cruz, Senior Mechanical Engineer/Associate and healthcare specialist at Integrated Design Solutions (IDS) in Troy, Michigan, began working on a new psychiatric…

Read More
Case Study: Valve Retrofit Eliminates Manual Balancing for Hot Water on Demand

CircuitSolver® Retrofit Eliminates Manual Balancing at Assisted Living Facility

September 1, 2026

David Texter, Lead Plumbing Engineer at Browne Engineering, discusses the benefits of specifying CircuitSolver® Thermostatic Balancing Valves for an installation project at the Twin…

Read More

A First-Time CircuitSolver® User

August 27, 2024

The Opportunity Luke Paschall, owner of Aquious, a family-owned plumbing business in Reno, Nevada, faced the challenge of balancing the domestic hot water…

Read More

Freeze Protection Valve Case Study: Bridge Over Frozen Waters

April 18, 2024

The Challenge: Preventing Frozen Pipes in Ware Shoals, SC Ware Shoals, South Carolina, has been plagued in recent winters by expensive repairs caused…

Read More

Electronics Division Manufactures Easy-to-Read Digital Thermometer for Breastmilk System

March 12, 2024

The Electronics Division of ThermOmegaTech® collaborated with Philadelphia-based entrepreneurs Amberlee and Joe Venti to bring their innovative breastmilk management system, PippySips, from concept…

Read More

Maternity Wing Renovation with CircuitSolver®

March 6, 2024

During the renovation of its maternity floors in 2023, UH St. John’s Medical Center in Westlake, Ohio, enlisted the expertise of Project Manager…

Read More

New E-Commerce HQ Install CSUAS for Hot Water on Demand

November 7, 2023

Joe Sargent, Onsite Plumbing Superintendent of W.E. Bowers of Beltsville, Maryland, recently completed a project where he installed CircuitSolver® balancing valves in the…

Read More

Drain Tempering Case Study: California Laboratory Remodel

September 14, 2023

A three-story pharmaceutical laboratory in La Jolla, California, underwent a complete remodel in 2017. The rooftop HVAC unit was replaced, and humidification was…

Read More

A Magical Castle Comes to Life With the Help of CircuitSolver®

July 6, 2023

Deep in the heart of Southern California, there resides a castle. At the LEGOLAND® Castle Hotel at LEGOLAND California Resort, 250 deluxe LEGO…

Read More
SMS Locomotive using GURU Plug

How an East Coast Rail Company Prevents Their Locomotives From Freezing

April 28, 2023

The GURU® Plug – The #1 Freeze Protection Valve Freeze protection is essential for locomotives during winter months to prevent catastrophic damage to…

Read More
Next