An Inside Look of BBQ Guru’s UltraQ Temperature Controller
April 19, 2022
UltraQ Box Build Project Overview A previous subsidiary of Logue Family Holdings, Inc. (LFH), BBQ Guru is the proud manufacturer of BBQ temperature controllers for low & slow cooking on charcoal grills and wood-burning smokers. Achieving that delicious, mouth-watering, savory…
Case Study: University of South Florida Fixed Hot Water Wait Times & Saved BIG
January 13, 2022
INSTALLATION SITE OVERVIEW University of South Florida (USF) The USF is a public university with its main campus located in Tampa. About 10% of the school’s almost 40,000 undergraduate students live in one of the 44 on-campus dormitories. After temporarily…
Georgia Snack Company Improves Washdown Safety Procedures with STVM®
July 1, 2021
For over 20 years, a Georgia snack company has struggled with a number of problems when using steam-heated water hoses during their facility cleaning and sanitizing processes. The biggest issue with these systems was that steam would bore out of…
Case Study: CircuitSolver® Install at the Mental Health Institute of Quebec
July 15, 2020
CircuitSolver® Install: Mental Health Institute of Quebec Case Study Installation Site Overview The Mental Health Institute of Quebec (IUSMQ) is a hospital specializing in psychiatric care. Founded in Quebec City in 2009, the facility has more than 500 beds for short-term…
Case Study: Residential CircuitSolver® Installation at The Austonian in Austin, TX
February 15, 2020
Residential CircuitSolver® Installation Case Study – The Austonian in Austin, TX Located in the heart of Austin, TX, The Austonian is a premier luxury residence boasting 360° views, unparalleled amenities, and a Four Star rating from Austin Energy Green Building. Towering over…
Galley Scald Protection To Protect Airline Crews
February 15, 2020
From their design and manufacture to daily operations, airplanes must be well-oiled machines to ensure strict schedules are kept and passengers and crew are safe while on board. Between the acceleration, physics, and the fact that you’re being hurtled into…
Case Study: Inspira Health CircuitSolver® Installation
December 15, 2019
Inspira Health CircuitSolver® Case Study – Mullica Hill, New Jersey, USA Installation Site Overview Opened in November of 2019, the 5-floor Mullica Hill Commons facility is a state-of-the-art general medical and surgical center, featuring specialized obstetrics and gynecology services. The…
CircuitSolver® Case Study: Bringing An Edge To St. Elizabeth Healthcare
October 15, 2019
St. Elizabeth Healthcare operates five facilities throughout Northern Kentucky, including St. Elizabeth Healthcare Edgewood, a state-of-the-art general medical and surgical facility. As a healthcare facility serving the larger Cincinnati metro area, there is a constant flow of patients, visitors, and medical…
Balancing From Coast to Coast With CircuitSolver®
September 6, 2017
For nearly a decade, CircuitSolver® has exceeded the standard for balancing domestic hot water systems. The thermostatic self-actuating balancing valve controls temperature and ensures hot water is delivered consistently to all fixtures without the need for manual balancing. The simple…
Case Study: Berks Center for Digestive Health
July 18, 2016
Installation Site Overview Berks Center for Digestive Health 1011 Reed Ave. Wyomissing, PA The Berks Center for Digestive Health is a full-service gastroenterology care center, housing offices for multiple practices and outpatient procedural rooms. The new tenant had the structure completely…